# Bloom Energy opens multi-gigawatt fuel cell manufacturing plant in Fremont, California

Bloom Energy announced the grand opening of its 164,000-square-foot manufacturing plant in Fremont, California, representing a $200 million investment. The plant will produce solid oxide fuel cells with an annual output of over one gigawatt, creating more than 400 clean energy jobs.

- Type: New facility
- Announced: 2022-07-21
- Where: Fremont, California, United States
- Value: $200.0M
- Jobs: 400
- Starts operating: 20 Jul 2022
- Status: completed
- Capacity: over 1 gigawatt per year
- Products: solid oxide fuel cells
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Bloom Energy](https://endata.com/companies/37136.md)

## Sources

- [patch.com](https://patch.com/california/fremont/multi-gigawatt-factory-opens-fremont), 2022-07-21: "Bloom Energy on Wednesday announced the grand opening of its multi-gigawatt manufacturing plant in Fremont, California."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
