# PGE Energia Ciepła and ELEMONT sign contract for gas unit at Kielce CHP plant

PGE Energia Ciepła S.A. and ELEMONT S.A. have signed a contract for the construction of a cogeneration system at the Kielce CHP plant, consisting of a gas turbine unit with 8 MWe electrical output and a water waste-heat boiler with 12 MWt thermal output.

- Type: Contract
- Announced: 2022-07-20
- Where: Kielce, Poland
- Status: announced
- Capacity: 8 MWe electrical, 12 MWt thermal
- Products: gas turbine unit, water waste-heat boiler, cogeneration system
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [PGE Energia Ciepła](https://endata.com/companies/15700.md) (customer)
- [ELEMONT](https://endata.com/companies/64257.md) (supplier)
- [Kawasaki Gas Turbine Europe GmbH](https://endata.com/companies/64258.md) (supplier)

## Sources

- [econstruction.pl](http://econstruction.pl/en/news/pge-energia-ciepla-sa-and-elemont-sa-have-signed-contract-construction-gas-unit), 2022-07-20: "The construction of the gas unit, based on a modern Kawasaki turbine with a waste-heat boiler, fits in perfectly with the policy of reducing emissions of harmful compounds into the atmosphere and producing clean energy for the city."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
