# NASSCO awarded $500M Navy contract for long-lead material for T-AO 211 and 212

General Dynamics NASSCO received a $500 million modification to a previously awarded contract to procure long-lead-time material in support of T-AO 211 and 212. Work will be performed at multiple locations and is expected to be completed by June 2027.

- Type: Contract
- Announced: 2022-06-28
- Where: San Diego, California; Iron Mountain, Michigan; Beloit, Wisconsin; Columbia, South Carolina; Arlington, Virginia; Chelsea, Alabama; Walpole, Massachusetts; New Orleans, Louisiana, United States
- Value: $500.0M
- Status: announced
- Products: long-lead-time material for T-AO 211 and 212
- Sectors: [Steel and Metal Products](https://endata.com/sectors/steel-metal-products.md)

## Companies

- [General Dynamics National Steel and Shipbuilding Co.](https://endata.com/companies/34921.md)
- [Naval Sea Systems Command](https://endata.com/companies/34922.md) (customer)

## Sources

- [defensedaily.com](https://www.defensedaily.com/contract-awards/contract-award-general-dynamics-national-steel-and-shipbuilding-co-nassco-san-diego-california-500000000/), 2022-06-28: "General Dynamics National Steel and Shipbuilding Co. (NASSCO), San Diego, California, is awarded a $500,000,000 modification to previously awarded contract N00024-16-C-2229 to award long-lead-time material in support of T-AO 211 and 212."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
