# GE Power India wins electro-mechanical contract for Saundatti hydro project

GE Power India Limited received a contract from Greenko KA01 IREP Private Limited for the complete electro-mechanical package for the 1,260 MW Saundatti Hydro Electric Power Project in Karnataka. The contract value is estimated at 863.4 crore rupees.

- Type: Contract
- Announced: 2022-06-26
- Where: Belgavi District, Karnataka, India
- Value: $108.0M (8.63B INR)
- Status: announced
- Products: electro-mechanical equipment for hydro power
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [GE Power India](https://endata.com/companies/3202.md) (supplier)
- [GREENKO KA01 IREP](https://endata.com/companies/12827.md) (customer)

## Sources

- [projectxindia.com](https://projectxindia.com/2022/06/26/electro-mechanical-package-for-the-1260-mw-saundatti-hydro-electric-power-project/), 2022-06-26: "GE Power India Limited has bagged a contract from Greenko KA01 IREP Private Limited for design, engineering, model testing, manufacture, shop testing, packing, supply, insurance, transportation and delivery at the project site, of complete electro-mechanical (E&M) package."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
