# Eiffage consortium wins contract for transition pieces for EnBW He Dreiht offshore wind farm

Eiffage, through Smulders in consortium with Sif, was awarded a contract by EnBW to manufacture 64 transition pieces for the EnBW He Dreiht offshore wind farm in the German North Sea. Manufacturing will start in first half of 2023 and the wind farm is expected to be commissioned in second half of 2025.

- Type: Contract
- Announced: 2022-06-21
- Where: Newcastle upon Tyne, United Kingdom (manufacturing); German North Sea (wind farm), Germany
- Status: announced
- Capacity: 900 MW
- Products: transition pieces for offshore wind turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [EnBW](https://endata.com/companies/6785.md) (customer)
- [Smulders](https://endata.com/companies/8167.md) (supplier)
- [Sif Holding](https://endata.com/companies/10492.md) (supplier)
- [Eiffage](https://endata.com/companies/28043.md) (supplier)

## Sources

- [eiffagemetal.com](https://www.eiffagemetal.com/newsroom/news/eiffage-wins-in-consortium-the-contract-for-transition-pieces-for-the-future-enbw-he-dreiht-offshore-wind-farm-off-the-german-coast), 2022-06-21: "Eiffage, through Smulders (the Belgian subsidiary of Eiffage Métal), in consortium with the Dutch company Sif, has been awarded by EnBW, a German energy company, the contract for the manufacturing of the 64 transition pieces of the future EnBW He Dreiht offshore wind farm."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
