# Alba signs EPC contract with Mitsubishi Power and SEPCOIII for Power Station 5 expansion

Aluminium Bahrain (Alba) signed a full turnkey contract with a consortium of Mitsubishi Power and SEPCOIII to expand Power Station 5 with a new 680.9 MW Combined Cycle Gas Turbine Power Block.

- Type: Contract
- Announced: 2022-06-16
- Where: Bahrain
- Status: announced
- Capacity: 680.9 MW
- Products: combined cycle gas turbine power block
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Mitsubishi Power](https://endata.com/companies/7073.md) (supplier)
- [Aluminium Bahrain](https://endata.com/companies/9766.md) (customer)
- [SEPCOIII](https://endata.com/companies/9767.md) (supplier)

## Sources

- [mccoypower.net](https://www.mccoypower.net/post/alba-signs-agreement-with-mitsubishi-power-sepcoiii-as-epc-contractor-for-block4-in-powerstation5), 2022-06-16: "Mitsubishi Power, a power solutions brand of Mitsubishi Heavy Industries, Ltd. (MHI), and SEPCOIII consortium signed a full turnkey contract today with Aluminium Bahrain B.S.C. (Alba) to expand Power Station 5 at Alba, adding a new 680.9 megawatts (MW) Combined Cycle Gas Turbine Power Block."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
