# Lockheed Martin awarded $67.4M contract for F-35A long-lead materials

Lockheed Martin Aeronautics received a $67.4 million modification to procure long-lead materials for eight Lot 17 F-35A aircraft for a Foreign Military Sales customer. Work will be performed at multiple sites and is expected to be completed by May 2026.

- Type: Contract
- Announced: 2022-06-13
- Where: Fort Worth, Texas; El Segundo, California; Warton, United Kingdom; Cameri, Italy; Orlando, Florida; Nashua, New Hampshire; Baltimore, Maryland; San Diego, California; Nagoya, Japan, United States
- Value: $67.4M
- Status: announced
- Products: F-35A aircraft, long lead-time materials
- Sectors: [Aerospace Components](https://endata.com/sectors/aerospace-components.md)

## Companies

- [Lockheed Martin](https://endata.com/companies/6612.md)

## Sources

- [defensedaily.com](https://www.defensedaily.com/contract-awards/contract-award-the-lockheed-martin-corp-lockheed-martin-aeronautics-co-fort-worth-texas-67400000/), 2022-06-13: "This modification increases the scope to procure long lead-time materials, parts, components, and effort for the production of eight Lot 17 F-35A aircraft for one Foreign Military Sales (FMS) customer."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
