# GE to triple solar and storage manufacturing capacity to 9 GW by end of 2022

GE plans to triple its manufacturing capacity for solar and battery energy storage systems to 9 GW per year by the end of 2022. The systems will be manufactured at a new factory near Chennai, India.

- Type: Expansion
- Announced: 2022-06-07
- Where: near Chennai, India, India
- Jobs: 250
- Starts operating: 2022
- Status: under construction
- Capacity: 9 GW per year
- Products: FLEXINVERTER, FLEXRESERVOIR
- Sectors: [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [GE Renewable Energy](https://endata.com/companies/3506.md)

## Sources

- [utilitydive.com](https://www.utilitydive.com/news/ge-solar-battery-storage-manufacturing-india/625070/), 2022-06-09: "GE plans to triple its manufacturing capacity for solar and battery energy storage systems to 9 GW per year by the end of 2022."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
