# CS Wind opens second wind tower factory in İzmir, Turkey

South Korean wind tower manufacturer CS Wind opened its second production facility in İzmir, Turkey. The company has invested around $60 million in both facilities in İzmir, and the second factory creates 250 new jobs.

- Type: New facility
- Announced: 2022-05-23
- Where: Aliağa Organized Industrial Zone, İzmir, Türkiye
- Value: $60.0M
- Jobs: 250
- Starts operating: 23 May 2022
- Status: completed
- Products: wind towers
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [CS Wind](https://endata.com/companies/7243.md)

## Sources

- [investinizmir.com](https://investinizmir.com/news/2022/south-korean-cs-wind-opened-its-second-wind-tower-factory-in-izmir/), 2022-05-23: "We, as the world's number one tower manufacturer, take the necessary action to increase our production network in response to the rapidly increasing global demand."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
