# Thermosilesia expands logistics center and builds new production hall in Ruda Śląska

Thermosilesia is building a new production hall for Rotenso devices, a new office building, and expanding its logistics center in Ruda Śląska, Poland, adding nearly 8,000 m² of space. Construction started in March 2022, with completion expected in spring 2023.

- Type: Expansion
- Announced: 2022-05-20
- Where: Ruda Śląska, Poland
- Starts operating: Q2 2023
- Status: under construction
- Capacity: 8000 m²
- Products: air conditioning and heating devices (Rotenso)
- Sectors: [HVAC and Industrial Refrigeration](https://endata.com/sectors/hvac-refrigeration.md)

## Companies

- [Thermosilesia](https://endata.com/companies/62983.md)

## Sources

- [propertynews.pl](https://www.propertynews.pl/magazyny/thermosilesia-buduje-nowe-biuro-i-hale-produkcyjna-w-rudzie-slaskiej,101871.html), 2022-05-20: "Thermosilesia rozbuduje centrum logistyczne, postawi nowe biuro i halę produkcyjną. Inwestycja w Rudzie Śląskiej da 8 tys. mkw."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
