# Seversk CHP plant modernization continues with 8 billion ruble investment

The modernization of the Seversk CHP plant, started in 2020 by Rosatom subsidiary RIR, is on schedule. The 8 billion ruble project includes installing two turbines and replacing 10 boilers by 2025.

- Type: Expansion
- Announced: 2022-04-20
- Where: Seversk, Tomsk Oblast, Russia
- Value: $104.0M (8.00B RUB)
- Starts operating: 2025
- Status: under construction
- Products: electricity, heat
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Rusatom Infrastructure Solutions](https://endata.com/companies/62376.md)

## Sources

- [riatomsk.ru](https://www.riatomsk.ru/article/20220420/modernizaciya-severskoj-tec), 2022-04-20: "Модернизация ТЭЦ Северска, начавшаяся в 2020 году, идет по плану – на станцию уже поступила первая партия крупного оборудования."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
