# SEW-Eurodrive expands MACC drive assembly in Aeroton, Johannesburg

SEW-Eurodrive is building a new assembly line for MACC air-cooled condenser drives at its new Aeroton facility in Johannesburg, South Africa, to increase production capacity to three units per week and cut lead times by 36 weeks.

- Type: Expansion
- Announced: 2022-04-01
- Where: Aeroton, Johannesburg, South Africa
- Status: under construction
- Capacity: three units per week
- Products: MACC air-cooled condenser drives
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md), [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Sew-Eurodrive](https://endata.com/companies/5718.md)

## Sources

- [miningreview.com](https://www.miningreview.com/energy/local-assembly-of-macc-drives-to-slash-lead-times/), 2022-04-01: "SEW-Eurodrive's expanded local capability out of its new Aeroton facility will include the assembly of SEW MACC air-cooled condenser drives for delivery at a rate of three units per week, slashing current lead times from overseas OEMs by approximately 36 weeks."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
