# Ochsner to build heat pump plant for 200 staff in Oed, Austria

Heat pump maker Ochsner is establishing a new site on a three-hectare plot in Oed, Lower Austria, with construction starting in 2022 and up to 200 jobs at full build-out. The site is planned to produce up to 20,000 heat pumps per year.

- Type: New facility
- Announced: 2021-06-15
- Where: Oed, Amstetten district, Austria
- Jobs: 200
- Status: announced
- Capacity: up to 20,000 heat pumps per year
- Products: heat pumps
- Sectors: [HVAC and Industrial Refrigeration](https://endata.com/sectors/hvac-refrigeration.md)

## Companies

- [Ochsner](https://endata.com/companies/7085.md)

## Sources

- [meinbezirk.at](https://www.meinbezirk.at/amstetten/c-wirtschaft/waermepumpenhersteller-ochsner-baut-fuer-200-mitarbeiter-in-oed_a4706432), 2021-06-15: "Das letzte freie Grundstück im Betriebsgebiet beim Autobahnanschluss Oed geht an den Wärmepumpenhersteller Ochsner."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
