# Codelco selects Sandvik for underground automation at El Teniente

Sandvik Mining and Rock Solutions received orders from Codelco for AutoMine automation systems and connected load and haul equipment valued at US$43 million for use at the El Teniente mine in Chile. The contract runs from 2022 to 2027.

- Type: Contract
- Announced: 2022-03-25
- Where: El Teniente mine, Chile
- Value: $43.0M
- Status: announced
- Products: AutoMine automation system, Toro TH663i trucks, LH514 loaders
- Sectors: [Mining Equipment](https://endata.com/sectors/mining-equipment.md), [Automation and Robotics](https://endata.com/sectors/automation-robotics.md)

## Companies

- [Codelco](https://endata.com/companies/8745.md) (customer)
- [Sandvik Mining and Rock Solutions](https://endata.com/companies/52567.md) (supplier)

## Sources

- [equipo-minero.com](https://www.equipo-minero.com/secciones/proveedores/codelco-selecciona-a-sandvik-para-automatizacion-subterranea-en-el-teniente/), 2022-03-25: "Sandvik Mining and Rock Solutions dijo que recibió un importante pedido por su sistema de automatización de carga y transporte AutoMine valorado en alrededor de US$27 millones de la minera nacional de cobre de Chile, Codelco"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
