# Corobrik's R800m Kwastina brick factory to reach full production by end March 2022

Corobrik's new Kwastina factory in Driefontein, South Africa, a R800 million investment, will enter full production by the end of March 2022. The plant can produce 100 million bricks per year.

- Type: Expansion
- Announced: 2022-03-16
- Where: Driefontein, South Africa
- Value: $54.0M (800.0M ZAR)
- Starts operating: 31 Mar 2022
- Status: completed
- Capacity: 100 million bricks per year
- Products: clay face bricks
- Sectors: [Construction Materials](https://endata.com/sectors/construction-materials.md)

## Companies

- [Corobrik](https://endata.com/companies/31431.md)

## Sources

- [infrastructurenews.co.za](https://infrastructurenews.co.za/2022/03/16/corobriks-r800m-kwastina-factory-to-enter-full-production-by-end-march/), 2022-03-16: "The commitment made by Corobrik at the South African Investment Conference at Sandton in 2019 has paid off handsomely, with its new Kwastina factory in Driefontein entering full production by the end of March."
- [corobrik.co.za](https://www.corobrik.co.za/post/kwastina-factory-in-full-production), 2022-04-28: "What makes this factory so exciting is that it allows us to compete anywhere in Southern Africa."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
