# Schneider Electric plans $138M expansion of El Paso plant

Schneider Electric announced a large expansion of its El Paso, Texas facility, adding 160,000 square feet and 400 jobs. The $138 million investment will focus on engineer-to-order switchboards and switchgear. Construction is expected to be completed by end of 2022.

- Type: Expansion
- Announced: 2022-03-12
- Where: El Paso, Texas, United States
- Value: $138.0M
- Jobs: 400
- Starts operating: 2022
- Status: announced
- Capacity: 160,000 square feet
- Products: switchboards, switchgear, panelboards
- Sectors: [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [Schneider Electric](https://endata.com/companies/2048.md)

## Sources

- [control.com](https://control.com/news/schneider-electric-plans-manufacturing-expansion-in-texas/), 2022-03-12: "Schneider Electric announced a large expansion to their El Paso, TX, plant. The new plant will add 160,000 square feet of manufacturing space and 400 new jobs."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
