# Hitachi Energy selected for NOAKA power-from-shore project

Hitachi Energy has been selected by Aker BP as technology partner for the NOAKA power-from-shore project off Norway, to perform FEED studies for a power quality solution enabling up to 150 MW of power from the mainland grid over a 250 km AC connection.

- Type: Contract
- Announced: 2022-03-09
- Where: Norwegian coast, North Sea, Norway
- Status: announced
- Capacity: 150 MW
- Products: power quality solution, STATCOM, series capacitors
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md), [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [Hitachi Energy](https://endata.com/companies/15140.md)
- [Aker BP](https://endata.com/companies/3380.md) (customer)

## Sources

- [cabletechnologynews.co.uk](https://www.cabletechnologynews.co.uk/hitachi-energy-selected-for-worlds-longest-ac-power-from-shore-project/), 2022-03-09: "Hitachi Energy has been selected by Aker BP, the Norwegian oil and gas exploration and production company, as technology partner for the NOAKA power-from-shore project off the Norwegian coast."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
