# Nippon Steel Engineering and Shikoku Electric Power win Matsuyama sludge fuel project

A joint venture of Nippon Steel Engineering and Shikoku Electric Power was selected as the successful bidder for Matsuyama City's West Purification Center sewage sludge solid fuel project. The contract value is 11,437,600,000 yen (excluding tax), with design and construction from March 2022 to September 2025, and O&M from October 2025 to March 2045.

- Type: Contract
- Announced: 2022-02-28
- Where: Matsuyama, Ehime, Japan, Japan
- Value: $100.0M (11.4B JPY)
- Status: announced
- Capacity: 90 tonnes of sewage sludge per day
- Products: solid fuel from sewage sludge, biomass fuel
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md), [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Nippon Steel Engineering](https://endata.com/companies/42148.md)
- [Shikoku Electric Power Company](https://endata.com/companies/36951.md) (partner)

## Sources

- [eng.nipponsteel.com](https://www.eng.nipponsteel.com/news/detail/20220228/), 2022-02-28: "日鉄エンジニアリングおよび四国電力の2社で構成する共同事業体は、松山市が実施予定の「西部浄化センター下水汚泥固形燃料化事業」について落札者に選定され、松山市公営企業局と基本協定を締結いたしました。"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.