# Ansaldo Energia wins 20-year maintenance contract for Egypt power plant

Ansaldo Energia was awarded a 20-year maintenance contract for eight gas turbines at the 6th October power plant in Cairo, Egypt, owned by Cairo Electricity Production Company.

- Type: Contract
- Announced: 2022-02-15
- Where: Cairo, Egypt
- Status: completed
- Products: gas turbine maintenance services
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Ansaldo Energia](https://endata.com/companies/5573.md) (supplier)
- [Cairo Electricity Production Company](https://endata.com/companies/20644.md) (customer)

## Sources

- [powerengineeringint.com](https://www.powerengineeringint.com/gas-oil-fired/ansaldo-energia-wins-maintenance-contract-for-egypts-6th-october-plant/), 2022-02-15: "Service is a strategic asset for Ansaldo Energia, strengthening long term relationships with key customers and paving the road to keep enhancing our products."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
