# BQE Water begins operations of Selen-IX plant for coal ash pond cleanup

BQE Water completed commissioning and began operations of a Selen-IX water treatment plant for a major American power utility to remediate a coal ash pond in the Eastern US. The plant has a capacity of 1,500 US gallons per minute and operates under contract to WesTech Engineering.

- Type: Contract
- Announced: 2022-02-02
- Where: Eastern US, United States
- Status: completed
- Capacity: 1,500 US gallons per minute
- Products: Selen-IX water treatment plant for selenium removal
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md), [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [BQE Water](https://endata.com/companies/5077.md) (supplier)
- [WesTech Engineering](https://endata.com/companies/28193.md) (customer)

## Sources

- [tnw-a.thenewswire.com](https://tnw-a.thenewswire.com/press-releases/1BQPF9NlM-bqe-water-completes-commissioning-and-begins-operations-of-selen-ix-tm-plant-for-coal-ash-pond-clean-up.html), 2022-02-02: "Very early on, we recognized the benefits of BQE Water’s Selen-IX technology for ash pond remediation and are extremely happy that Selen-IX performs to and exceeds expectations."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
