# Fuji Electric to invest in SiC power semiconductor production in Goshogawara

Fuji Electric Co., Ltd. decided to invest in Fuji Electric Tsugaru Semiconductor Co., Ltd. in Goshogawara City, Aomori Prefecture, to increase production of SiC power semiconductors. Mass production is planned to begin in fiscal 2024. The company's total power semiconductor investments are expected to expand to 190 billion yen.

- Type: Investment
- Announced: 2022-01-27
- Where: Goshogawara City, Aomori Prefecture, Japan
- Starts operating: 2024
- Status: announced
- Products: SiC power semiconductors
- Sectors: [Semiconductors and Industrial Electronics](https://endata.com/sectors/semiconductors-electronics.md)

## Companies

- [Fuji Electric](https://endata.com/companies/13773.md)
- [Fuji Electric Tsugaru Semiconductor](https://endata.com/companies/60654.md)

## Sources

- [americas.fujielectric.com](https://americas.fujielectric.com/capital-investment-for-increase-in-production-of-sic-power-semiconductors/), 2022-01-27: "FE has made a decision to carry out capital investment in Fuji Electric Tsugaru Semiconductor Co., Ltd. for an increase in the production of SiC power semiconductors."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
