# Lockheed Martin awarded $847M contract for F-35 long lead materials

Lockheed Martin Aeronautics Co. received a $847,025,000 modification to procure long lead materials for 105 Lot 17 F-35 aircraft. Work will be performed at multiple locations and is expected to be completed by May 2026.

- Type: Contract
- Announced: 2021-12-29
- Where: Fort Worth, Texas, United States
- Value: $847.0M
- Status: announced
- Products: F-35 Joint Strike Fighter aircraft, long lead materials
- Sectors: [Aerospace Components](https://endata.com/sectors/aerospace-components.md)

## Companies

- [Naval Air Systems Command](https://endata.com/companies/15742.md) (customer)
- [Lockheed Martin Aeronautics](https://endata.com/companies/31990.md) (supplier)

## Sources

- [defensedaily.com](https://www.defensedaily.com/contract-awards/contract-award-lockheed-martin-corp-lockheed-martin-aeronautics-co-fort-worth-texas-847025000/), 2021-12-29: "This modification increases the scope to procure long lead materials, parts, components, and efforts associated with the production of 105 Lot 17 Joint Strike Fighter aircraft."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
