# Vaillant Group to build €120M heat pump plant in Senica, Slovakia

Vaillant Group Heat Pump Production announced the construction of a new production plant for heat pumps in Senica, Slovakia, with a total investment of €120 million. The plant will create over 800 jobs, construction is expected to start in spring 2022, and production is planned for the second half of 2023.

- Type: New facility
- Announced: 2021-12-26
- Where: Senica, Slovakia
- Value: $136.0M (120.0M EUR)
- Jobs: 800
- Starts operating: Q3 2023
- Status: announced
- Products: heat pumps, outdoor units, indoor hydraulic modules
- Sectors: [HVAC and Industrial Refrigeration](https://endata.com/sectors/hvac-refrigeration.md)

## Companies

- [Vaillant Group Heat Pump Production](https://endata.com/companies/58751.md)

## Sources

- [teraz.sk](https://www.teraz.sk/ekonomika/senica-investor-predstavil-investiciu/600358-clanok.html), 2021-12-26: "Cieľom je vybudovať jeden z najinovatívnejších závodov na výrobu tepelných čerpadiel v Európe."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
