# Manz AG wins EUR 70M+ order from Britishvolt for lithium-ion cell assembly equipment

Manz AG received a major order from Britishvolt to supply cell assembly equipment for the first expansion stage of a lithium-ion battery cell production line in Northumberland, England. The order volume is over EUR 70 million for a 4 GWh capacity line. Delivery is scheduled for 2023, with production start by end of 2023.

- Type: Contract
- Announced: 2021-12-24
- Where: Cambois, Northumberland, England, United Kingdom
- Value: $79.0M (70.0M EUR)
- Status: announced
- Capacity: 4 GWh
- Products: lithium-ion cell assembly equipment, cylindrical battery cell production line
- Sectors: [Automation and Robotics](https://endata.com/sectors/automation-robotics.md), [Semiconductors and Industrial Electronics](https://endata.com/sectors/semiconductors-electronics.md)

## Companies

- [Manz AG](https://endata.com/companies/59048.md) (supplier)
- [Britishvolt](https://endata.com/companies/59925.md) (customer)

## Sources

- [batteryindustry.net](https://batteryindustry.net/manz-ag-wins-major-order-from-britishvolt-for-lithium-ion-cell-assembly-equipment-for-pioneering-gigawatt-production-line/), 2021-12-24: "Manz AG has been assigned by UK battery cell technology developer and manufacturer Britishvolt to implement the first expansion stage for cell-assembly of a production line for the manufacture of lithium-ion battery cells in Northumberland, Northern England."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
