# Sandvik wins $14.5M surface mining equipment order from Newcrest for Red Chris mine

Sandvik Mining and Rock Solutions won a C$18.5 million ($14.5 million) order from Newcrest Mining for surface mining equipment, including two Sandvik Leopard DI650i and two Sandvik DR412i drills, for the Red Chris copper-gold mine in British Columbia. Delivery is scheduled for Q4 2021.

- Type: Contract
- Announced: 2021-12-23
- Where: Red Chris mine, British Columbia, Canada
- Value: $14.5M
- Status: announced
- Products: Leopard DI650i blasthole drill, DR412i blasthole drill
- Sectors: [Mining Equipment](https://endata.com/sectors/mining-equipment.md)

## Companies

- [Sandvik Mining and Rock Solutions](https://endata.com/companies/52567.md)
- [Newcrest Mining](https://endata.com/companies/6567.md) (customer)

## Sources

- [mining.com](https://www.mining.com/newcrest-awards-18-5m-pit-equipment-order-to-sandvik/), 2021-12-23: "Sandvik Mining and Rock Solutions has won an C$18.5 million ($14.5m) order for surface mining equipment from Newcrest Mining."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
