# Siemens Energy signs first long-term service agreement with Saudi Aramco

Siemens Energy signed its first long-term service agreement with Saudi Aramco covering turbines and generators at four major oil fields, with a duration of 15 years. The announcement was made on 31 March 2021.

- Type: Contract
- Announced: 2021-03-31
- Where: Hawiyah, east of Riyadh, Saudi Arabia
- Status: announced
- Capacity: 20 compression trains
- Products: gas turbines, generators, long-term service agreements
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Siemens Energy](https://endata.com/companies/6803.md)
- [Saudi Aramco](https://endata.com/companies/304.md) (customer)
- [Samsung Engineering](https://endata.com/companies/977.md) (partner)
- [Aramco](https://endata.com/companies/2946.md) (customer)
- [Siemens Energy](https://endata.com/companies/6803.md) (supplier)

## Sources

- [saudigulfprojects.com](https://www.saudigulfprojects.com/2021/03/siemens-awarded-long-term-service-contract-with-saudi-aramco/), 2021-03-31: "The LTSA will cover a range of turbines and generators at four major oil fields."
- [siemens-energy.com](https://www.siemens-energy.com/us/en/home/press-releases/siemens-energy-ships-first-compression-train-aramco-gas-reservoir-storage-project.html), 2021-04-05: "Siemens Energy has shipped the first of 20 locally assembled centrifugal compressor systems to Aramco's Hawiyah Unayzah Gas Reservoir Storage (HUGRS) project."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
