# MHI awarded turbomachinery order for Ust-Luga LNG plant in Russia

Mitsubishi Heavy Industries (MHI) was awarded by Linde Engineering the main refrigeration gas compression trains for the Ust-Luga LNG project in Russia, consisting of four H-100 gas turbines and ten centrifugal compressors. The LNG plant is expected to start production by 2026.

- Type: Contract
- Announced: 2021-11-25
- Where: Ust-Luga, Leningrad Oblast, Russia
- Status: announced
- Capacity: 13 million tons per annum (mtpa) LNG
- Products: gas turbines, centrifugal compressors, LNG
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Mitsubishi Heavy Industries](https://endata.com/companies/493.md) (supplier)
- [Linde Engineering](https://endata.com/companies/1100.md) (customer)
- [Gazprom](https://endata.com/companies/1153.md) (partner)
- [RusGazDobycha](https://endata.com/companies/13393.md) (partner)
- [RusChemAlliance](https://endata.com/companies/59249.md) (customer)

## Sources

- [power.mhi.com](https://power.mhi.com/news/20211125.html), 2021-11-25: "We are pleased to supply MHI's H-100 driven compressor trains for this prestigious Ust-Luga LNG plant."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
