# Grupo Lala expands wastewater treatment plant in Torreón

Grupo Lala inaugurated the expansion of its wastewater treatment plant at its Complejo Industrial Laguna in Torreón, Mexico. The expansion cost 110 million pesos and adds capacity to process 30 liters of water per second, bringing total capacity to 50 liters per second.

- Type: Expansion
- Announced: 2021-11-25
- Where: Torreón, Coahuila, Mexico, Mexico
- Value: $5.40M (110.0M MXN)
- Starts operating: 25 Nov 2021
- Status: completed
- Capacity: 30 liters per second (additional); 50 liters per second (total)
- Products: treated water
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [Grupo Lala](https://endata.com/companies/59238.md)

## Sources

- [elsiglodetorreon.com.mx](https://www.elsiglodetorreon.com.mx/noticia/2021/grupo-lala-amplia-su-planta-tratadora-de-aguas-residuales.html), 2021-11-25: "Con la puesta en marcha de esta ampliación de la planta tratadora, reafirmamos el compromiso con la sustentabilidad, la reducción del impacto ambiental de nuestras operaciones, y el cumplimiento al marco normativo"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
