# Bauer breaks ground on 30,000 sq. ft. addition at Connecticut HQ

Bauer held a groundbreaking ceremony for a 30,000 sq. ft. expansion at its Bristol, Connecticut headquarters to increase manufacturing capacity. The addition is expected to be fully operational by September 2022.

- Type: Expansion
- Announced: 2021-11-11
- Where: Bristol, Connecticut, United States
- Starts operating: Sep 2022
- Status: under construction
- Capacity: 30,000 sq. ft.
- Products: aircraft component test and support equipment
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md)

## Companies

- [Bauer](https://endata.com/companies/58931.md)

## Sources

- [bauerct.com](https://www.bauerct.com/company-news/bauer-breaks-ground-on-30000-sq-ft-addition-at-connecticut-headquarters/), 2021-11-11: "Bauer plans to use the new space to increase its manufacturing capacity; including fabrication, machining, and assembly."
- [spotonconnecticut.com](https://spotonconnecticut.com/ct-river-valley/613645/bristol-economic-and-community-development.html), 2021-12-04: "The Bristol Economic and Community Development Board of Commissioners approved a site plan and heard upcoming plans for a new 29,000 square foot addition to Bauer, Inc."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
