# Synthos to build 120,000 t/y butadiene plant at Plock, Poland

Synthos is building a new butadiene extrusion unit with 120,000 t/y capacity at Plock, Poland, due on stream in 2024. Air Liquide Engineering and Construction will provide EPC services and BASF's NMP butadiene extraction technology.

- Type: New facility
- Announced: 2021-10-05
- Where: Plock, Poland, Poland
- Starts operating: 2024
- Status: announced
- Capacity: 120,000 t/y
- Products: butadiene
- Sectors: [Specialty Chemicals](https://endata.com/sectors/specialty-chemicals.md), [Plastics and Polymers](https://endata.com/sectors/plastics-polymers.md)

## Companies

- [Synthos](https://endata.com/companies/52062.md)
- [BASF](https://endata.com/companies/298.md) (supplier)
- [Air Liquide Engineering and Construction](https://endata.com/companies/58177.md) (partner)

## Sources

- [chemanager-online.com](https://chemanager-online.com/en/news/synthos-to-build-butadiene-plant-at-plock), 2021-10-05: "The new facility due on stream in 2024 will have an ultimate capacity of 120,000 t/y and will feed the company's production in central and eastern Europe."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
