# MILKOM builds wastewater treatment plant at Sarapul-moloko facility

OAO MILKOM is constructing a local wastewater treatment system at its Sarapul-moloko production facility in Udmurtia, Russia, with a capacity of 1,000 cubic meters per day. The project is part of the MILKOM-2020 investment contract and is expected to start operations in April 2022.

- Type: Expansion
- Announced: 2021-09-30
- Where: Sarapul, Udmurtia, Russia, Russia
- Starts operating: Apr 2022
- Status: under construction
- Capacity: 1,000 cubic meters per day
- Products: wastewater treatment system
- Sectors: [Water Treatment Equipment](https://endata.com/sectors/water-treatment-equipment.md)

## Companies

- [MILKOM](https://endata.com/companies/58038.md)

## Sources

- [komos.ru](https://www.komos.ru/press-center/news/25435/), 2021-09-30: "Запуск ЛОС в промышленную эксплуатацию планируется в апреле 2022 года."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
