# Vestas wins 207 MW wind turbine order from Duke Energy for Iowa project

Vestas secured a 207 MW order from Duke Energy Sustainable Solutions for the Ledyard Windpower project in Iowa, USA. The order includes 46 V150-4.5 MW turbines, supply, commissioning, and a 10-year service agreement. Delivery begins Q2 2022, commissioning in Q4 2022.

- Type: Contract
- Announced: 2021-09-28
- Where: Iowa, USA, United States
- Status: announced
- Capacity: 207 MW (wind power)
- Products: V150-4.5 MW wind turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Vestas](https://endata.com/companies/1364.md) (supplier)
- [Duke Energy Sustainable Solutions](https://endata.com/companies/57979.md) (customer)

## Sources

- [windtech-international.com](https://www.windtech-international.com/projects-and-contracts/vestas-wins-207-mw-in-the-usa), 2021-09-28: "Vestas has secured a 207 MW order from Duke Energy Sustainable Solutions to power the Ledyard Windpower project in Iowa, USA, featuring 46 V150-4.5 MW wind turbines."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
