# Grimard awarded strategic contract with Hydro-Québec for switchgear replacement

Grimard has obtained a strategic contract with Hydro-Québec to replace all 11kV switchgear at a power station. The order is described as the largest switchgear cabinet order for Hydro-Québec, with manufacturing extending until 2025.

- Type: Contract
- Announced: 2020-01-01
- Where: Canada
- Status: announced
- Products: 11kV switchgear cabinets
- Sectors: [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [Grimard](https://endata.com/companies/57932.md)
- [Hydro-Québec](https://endata.com/companies/3478.md) (customer)

## Sources

- [grimard.ca](https://www.grimard.ca/contrat-strategique-avec-hydro-quebec/), 2021-09-24: "Selon Hydro-Québec, il s'agirait de la plus grosse commande d'armoires de commutation, sans compter que la fabrication d'appareillage s'échelonnera jusqu'en 2025."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
