# LS Cable & System to build fourth plant in Donghae, South Korea

LS Cable & System is investing 120.2 billion won to build a fourth plant in Donghae, Gangwon Province, South Korea, to produce extra-high-voltage cables. Construction starts in September 2021, with operations expected in December 2023, creating about 100 new jobs.

- Type: New facility
- Announced: 2021-08-31
- Where: Donghae, Gangwon Province, South Korea
- Value: $101.0M (120.2B KRW)
- Jobs: 100
- Starts operating: Dec 2023
- Status: announced
- Products: extra-high-voltage cables
- Sectors: [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [LS Cable & System](https://endata.com/companies/21025.md)

## Sources

- [mk.co.kr](https://www.mk.co.kr/news/society/10010715), 2021-08-31: "LS전선이 강원도 동해시에 제4공장을 신설한다."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
