# Ciner Group expands glass packaging capacity in Bozüyük, Bilecik

Ciner Group, through its subsidiary Park Cam, is building a third furnace at its glasshouse in Bozüyük, Bilecik, with an investment of 1.2 billion Turkish Liras. The expansion will add capacity for 2.8 billion glass bottles annually and create 100 jobs, with operations expected to start before the second half of 2022.

- Type: Expansion
- Announced: 2021-08-30
- Where: Bozüyük, Bilecik, Türkiye
- Jobs: 100
- Starts operating: Q3 2022
- Status: under construction
- Capacity: 2.8 billion glass bottles annually
- Products: glass bottles
- Sectors: [Packaging](https://endata.com/sectors/packaging.md)

## Companies

- [Park Cam](https://endata.com/companies/8559.md)
- [Ciner Group](https://endata.com/companies/29444.md)

## Sources

- [cinergroup.com.tr](https://www.cinergroup.com.tr/en/news/haber/3177373-ciner-glass-maden-kimya-sanayi), 2021-08-30: "We have two furnaces in Bozüyük for glass packaging, and now we are building the third one."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
