# Tosyalı orders ladle furnaces and combi-caster from SMS group for new steel plant

Tosyalı Demir Çelik Sanayi ordered three ladle furnaces and a seven-strand high-speed combi-continuous casting machine from SMS group for a new greenfield steel production facility in Sarıseki, Turkey. The meltshop is scheduled to be commissioned in early September 2022.

- Type: Contract
- Announced: 2021-07-26
- Where: Sarıseki, İskenderun, Türkiye
- Status: announced
- Capacity: 2.2 million metric tons per year (annual production capacity of the new facility)
- Products: steel billets, blooms, beam blanks
- Sectors: [Steel and Metal Products](https://endata.com/sectors/steel-metal-products.md)

## Companies

- [SMS group](https://endata.com/companies/2366.md) (supplier)
- [Tosyalı Demir Çelik Sanayi](https://endata.com/companies/56674.md) (customer)

## Sources

- [steelorbis.com](https://www.steelorbis.com/steel-news/latest-news/turkeys-tosyali-orders-three-ladle-furnaces-and-a-seven-strand-high-speed-combi-caster-1209015.htm), 2021-07-26: "German plantmaker SMS group has announced that it will supply three ladle furnaces and a seven-strand high-speed combi-continuous casting machine to Tosyalı Demir Çelik Sanayi."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
