# Hitachi ABB Power Grids to supply prefabricated substation for Linde gasification plant

Hitachi ABB Power Grids will supply a prefabricated containerized gas-insulated substation to connect Linde's new gasification plant in Singapore to the high-voltage grid. The plant is Linde's largest gasification investment and is expected to be completed in 2022.

- Type: Contract
- Announced: 2021-07-21
- Where: Singapore, Singapore
- Status: announced
- Products: prefabricated containerized gas-insulated substation, gas-insulated switchgear
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Linde](https://endata.com/companies/472.md) (customer)
- [Hitachi ABB Power Grids](https://endata.com/companies/8446.md) (supplier)

## Sources

- [hitachienergy.com](https://www.hitachienergy.com/me/en/news-and-events/features/2021/07/prefabricated-grid-integration-ticks-all-linde-s-boxes), 2021-07-21: "Our prefabricated containerized substations shift assembly, installation and testing from the customer’s site to our integration yards, where the work is done in advance of delivery."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
