# Maxim Power Corp. proceeds with Milner 2 CCGT expansion project

Maxim Power Corp. announced it is proceeding with the expansion of its M2 facility into a combined cycle gas turbine (CCGT) plant, increasing capacity from 204 MW to approximately 300 MW. The project cost is estimated at $125 million, and commercial operations are expected in December 2022.

- Type: Expansion
- Announced: 2021-06-30
- Where: Canada
- Value: $125.0M
- Starts operating: Dec 2022
- Status: announced
- Capacity: 300 MW
- Products: electricity
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Maxim Power Corp.](https://endata.com/companies/56171.md)

## Sources

- [globenewswire.com](https://www.globenewswire.com/news-release/2021/07/01/2256182/0/en/maxim-power-corp-announces-milner-2-ccgt-project-epc-contract-and-financing-arrangements.html), 2021-07-01: "The CCGT expansion project is anticipated to increase total generation capacity from 204 MW to approximately 300 MW and improve operational efficiency resulting in lower operating and maintenance costs per MWh."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.