# GE Renewable Energy's Bergama blade plant produces 1111th blade

GE Renewable Energy's LM Wind Power blade manufacturing site in Bergama, Turkey, produced its 1111th wind turbine blade, four years after starting production. The site represents an $80 million investment and employs over 800 people.

- Type: Expansion
- Announced: 2021-06-22
- Where: Bergama, İzmir, Türkiye
- Value: $80.0M
- Jobs: 800
- Starts operating: Jul 2017
- Status: completed
- Capacity: 1111 blades (1.58 GW total capacity)
- Products: wind turbine blades
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [GE Renewable Energy](https://endata.com/companies/3506.md)
- [LM Wind Power](https://endata.com/companies/3505.md) (partner)

## Sources

- [gevernova.com](https://www.gevernova.com/news/press-releases/ge-renewable-energy-bergama-wind-turbine-blade-manufacturing-site-produces-1111th-blade), 2021-06-22: "GE Renewable Energy today announces the production of the 1111th wind turbine blade at its LM Wind Power's wind turbine blade manufacturing site in Turkey"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
