# ABB to supply 95 power converters to GE for Dogger Bank Wind Farm

ABB will deliver 95 PCS6000 medium voltage converters to GE Renewable Energy for installation in GE's Haliade-X 13 MW wind turbines at the Dogger Bank Wind Farm in the UK. First delivery is scheduled for summer 2021 with completion in late 2022.

- Type: Contract
- Announced: 2021-06-10
- Where: Dogger Bank Wind Farm, UK, United Kingdom
- Status: announced
- Capacity: 1.2 GW
- Products: PCS6000 medium voltage converters, wind turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md), [Electrical Equipment](https://endata.com/sectors/electrical-equipment.md)

## Companies

- [ABB](https://endata.com/companies/1547.md) (supplier)
- [GE Renewable Energy](https://endata.com/companies/3506.md) (customer)

## Sources

- [new.abb.com](https://new.abb.com/news/detail/79198/abb-to-deliver-power-converters-for-the-worlds-largest-offshore-wind-farm), 2021-06-10: "ABB will deliver 95 units to GE Renewable Energy. The converters will be installed in the world’s most powerful offshore wind turbines at the UK’s Dogger Bank Wind Farm."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
