# Doosan Škoda Power to supply steam turbine for Polish waste-to-energy plant

Doosan Škoda Power entered a contract to supply a DST-S20 steam turbine for a waste-to-energy plant in Olsztyn, Poland, scheduled for completion in 2023.

- Type: Contract
- Announced: 2021-06-08
- Where: Olsztyn, Poland
- Status: announced
- Capacity: 110,000 tons of refuse-derived fuel per year
- Products: steam turbine
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Doosan Škoda Power](https://endata.com/companies/6153.md) (supplier)
- [Dobra Energia dla Olsztyna](https://endata.com/companies/55659.md) (customer)

## Sources

- [world-energy.org](https://www.world-energy.org/article/18184.html), 2021-06-08: "The new plant, scheduled to be completed in 2023, will be capable of processing up to 110,000 tons of refuse-derived fuel."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
