# DTE Energy building 1.15GW Blue Water Energy Centre combined-cycle power plant in Michigan

DTE Energy is developing the 1.15GW Blue Water Energy Centre natural gas-fired combined-cycle power plant in St. Clair County, Michigan, with construction started in August 2019 and commissioning expected by June 2022.

- Type: New facility
- Announced: 2021-06-03
- Where: East China Township, St. Clair County, Michigan, United States
- Value: $1.00B
- Starts operating: Jun 2022
- Status: under construction
- Capacity: 1150 MW
- Products: electricity
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [DTE Energy](https://endata.com/companies/27519.md)

## Sources

- [nsenergybusiness.com](https://www.nsenergybusiness.com/projects/blue-water-energy-centre/), 2021-06-03: "The construction works were started in August 2019 with the plant commissioning expected by June 2022."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.