# T Plus to acquire two combined-cycle plants from Power Machines for modernization

T Plus will install two 65-80 MW turbines from Power Machines at Saratovskaya CHPP-1 and Permskaya CHPP-14 by April 2028, with each project costing about 10 billion rubles.

- Type: Contract
- Announced: 2021-05-20
- Where: Saratov; Perm, Russia
- Value: $270.0M (20.0B RUB)
- Status: announced
- Capacity: 65-80 MW per turbine
- Products: combined-cycle plants, gas turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [T-Plus](https://endata.com/companies/34410.md)
- [Power Machines](https://endata.com/companies/15083.md) (supplier)

## Sources

- [tek-all.ru](https://www.tek-all.ru/en/news/id7610-pjsc-t-plus-acquires-two-combined-cycle-plants-of-jsc-power-machines/), 2021-05-20: "The supplier of turbines for T Plus, according to Kommersant, will become Power Machines Alexey Mordashov Mr. Wagner said that the company is in negotiations with Power Machines."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
