# GE Renewable Energy to supply 87 Haliade-X 14 MW turbines for Dogger Bank C

GE Renewable Energy confirmed a contract to supply 87 Haliade-X 14 MW turbines for the Dogger Bank C offshore wind farm, a joint venture between SSE Renewables and Equinor. Turbines are to be installed in 2025.

- Type: Contract
- Announced: 2021-05-19
- Where: North Sea, off northeast England, United Kingdom
- Status: announced
- Capacity: 1.2 GW
- Products: Haliade-X 14 MW wind turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Equinor](https://endata.com/companies/1741.md) (customer)
- [GE Renewable Energy](https://endata.com/companies/3506.md) (supplier)
- [SSE Renewables](https://endata.com/companies/5722.md) (customer)

## Sources

- [cnbc.com](https://www.cnbc.com/2021/05/19/last-phase-of-worlds-largest-offshore-wind-farm-to-use-ge-turbines.html), 2021-05-19: "The final phase of a development dubbed 'the world's largest offshore wind farm' is to use 14 megawatt versions of GE Renewable Energy's huge Haliade-X turbine after a contract for their supply was confirmed."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
