# GE Renewable Energy finalizes turbine supply and service contracts for Dogger Bank C offshore wind farm

GE Renewable Energy has finalized contracts to supply 87 Haliade-X 14 MW turbines and provide service and warranty for the third phase of the Dogger Bank offshore wind farm (Dogger Bank C). The contract is subject to financial close expected late 2021.

- Type: Contract
- Announced: 2021-05-18
- Where: North Sea (Dogger Bank), United Kingdom
- Jobs: 470
- Status: announced
- Products: Haliade-X 14 MW offshore wind turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [Equinor](https://endata.com/companies/1741.md) (customer)
- [GE Renewable Energy](https://endata.com/companies/3506.md) (supplier)
- [SSE Renewables](https://endata.com/companies/5722.md) (customer)

## Sources

- [nawindpower.com](https://nawindpower.com/ge-renewable-energy-secures-final-turbine-service-contracts-for-dogger-bank-c), 2021-05-18: "GE Renewable Energy has finalized the turbine supply and service and warranty contracts for the third and final phase of the Dogger Bank offshore wind farm, Dogger Bank C."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
