# REP Holding to supply 12 centrifugal compressor sets for Power of Siberia pipeline

REP Holding will supply 12 sets of ЦБК405 centrifugal compressors for the second phase of the Power of Siberia gas pipeline, under a contract with Kazankompressormash for GPA-16U units, as announced on 30 October 2020.

- Type: Contract
- Announced: 2020-10-30
- Where: Power of Siberia pipeline compressor stations, Russia
- Status: announced
- Capacity: 12 compressor sets, 16 MW GPA-16U units
- Products: centrifugal compressors
- Sectors: [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md)

## Companies

- [REP Holding](https://endata.com/companies/2682.md) (supplier)
- [Kazankompressormash](https://endata.com/companies/4398.md) (customer)

## Sources

- [armtorg.ru](https://armtorg.ru/news/34450/), 2020-10-30: "«РЭП Холдинг» поставит 12 комплектов центробежных компрессоров типа ЦБК405-1,50/101-5300/16С для второй очереди возведения магистрального газопровода «Сила Сибири»."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
