# APR Energy secures contract with Imperial Irrigation District for mobile turbines

APR Energy secured a contract with California's Imperial Irrigation District to provide three gas turbines for distributed generation capacity over three sites during the 2021 summer months. The solution is expected to become operational in June 2021.

- Type: Contract
- Announced: 2021-05-05
- Where: California, United States
- Status: announced
- Products: gas turbines, distributed generation capacity
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [APR Energy](https://endata.com/companies/43421.md)
- [Imperial Irrigation District](https://endata.com/companies/54924.md) (customer)

## Sources

- [newswire.ca](https://www.newswire.ca/fr/news-releases/apr-energy-announces-north-american-grid-stability-solution-852367223.html), 2021-05-05: "APR's fast-track power solution will assist in maintaining frequency and provide needed backup capacity within IID's service territory."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
