# APR Energy secures 330MW baseload power contracts in Mexicali, Mexico

APR Energy secured contracts to provide up to 330MW of baseload power using 10 gas turbines across three sites in Mexicali, Baja California, Mexico, for the summer peaking protocol.

- Type: Contract
- Announced: 2021-04-29
- Where: Mexicali, Baja California, Mexico
- Status: announced
- Capacity: 330 MW
- Products: baseload power generation, gas turbines
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [APR Energy](https://endata.com/companies/43421.md)
- [Atlas Holdings](https://endata.com/companies/2572.md) (partner)

## Sources

- [aprenergy.com](https://www.aprenergy.com/apr-energy-secures-contracts-to-provide-up-to-330mw-of-baseload-power-in-mexico/), 2021-04-29: "APR Energy has secured contracts to utilize 10 gas turbines rated for up to 330MW of generation capacity for the summer peaking protocol across three sites in Mexicali, Baja California, Mexico."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
