# NKT awarded EUR 95M cable contract for Troll West electrification

NKT has been awarded a turnkey contract by Equinor Energy AS to supply and install over 110 km of 145 kV high-voltage AC offshore power cable system for the Troll West electrification project in the North Sea, valued at approximately EUR 95 million.

- Type: Contract
- Announced: 2021-04-23
- Where: North Sea, Kollsnes, Norway, Norway
- Value: $113.0M (95.0M EUR)
- Status: announced
- Products: 145 kV high-voltage AC offshore power cable system, dynamic power cables
- Sectors: [Power Generation Equipment](https://endata.com/sectors/power-generation-equipment.md)

## Companies

- [NKT](https://endata.com/companies/15394.md)
- [Equinor](https://endata.com/companies/1741.md) (customer)
- [NKT](https://endata.com/companies/15394.md) (supplier)
- [Equinor Energy AS](https://endata.com/companies/35190.md) (customer)

## Sources

- [investors.nkt.com](https://investors.nkt.com/company-announcements/2021/nkt-awarded-turnkey-high-voltage-ac-order-to-provide-power-from-shore-to-troll-west/), 2021-04-23: "The Troll West order is special to us."
- [transformer-magazine.com](https://transformer-magazine.com/news/nkt-lands-turnkey-high-voltage-ac-order-for-troll-west/), 2021-05-10: "The Troll West order is special to us. Not only does it sustain our long-term collaboration with Equinor, but it also proves our leading position within dynamic power cables"

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
