# WINKEL GmbH completes large assembly hall 3 expansion in Illingen

WINKEL GmbH completed the construction of large assembly hall 3 in Illingen, Germany, after 8 months and an investment of 4 million euros. The expansion increased production area from 4,800 sqm to 7,300 sqm and created 20 new jobs.

- Type: Expansion
- Announced: 2021-04-15
- Where: Illingen, Germany
- Value: $4.80M (4.00M EUR)
- Jobs: 20
- Starts operating: 15 Apr 2021
- Status: completed
- Capacity: 7,300 sqm production area
- Products: logistics systems, FAST-PICK systems, linear guides
- Sectors: [Material Handling](https://endata.com/sectors/material-handling.md), [Industrial Machinery](https://endata.com/sectors/industrial-machinery.md)

## Companies

- [Winkel](https://endata.com/companies/18704.md)

## Sources

- [winkel.de](https://www.winkel.de/en/winkel-news/2021/large-winkel-assembly-hall-3-completed-in-april-2021), 2021-04-15: "After a construction period of 8 months and an investment sum of 4 million euros, the large assembly hall 3 was completed in April 2021."

---
Data from Endata (https://endata.com/). Announcements are summarized from public sources and may be incomplete; check the linked originals.
